HUAWEI RNC 6900 PDF

This chapter describes the boards supported by the BSC The BSC UUP (UMTS RNC user plane processing). -. -. 2 GE. 2 GE. Home/Groups/Wireless Network Info Community. BSC e BSC RNC in Pool. Armetta Diamond (1) 4 years 6 months ago View: Reply: 0. Comment. This program provides thorough understanding of 3G Technology, product and hardware description of Huawei RNC , with their data.

Author: Mazushura Daijar
Country: Algeria
Language: English (Spanish)
Genre: Health and Food
Published (Last): 23 January 2015
Pages: 433
PDF File Size: 8.33 Mb
ePub File Size: 12.54 Mb
ISBN: 969-5-64721-161-1
Downloads: 60076
Price: Free* [*Free Regsitration Required]
Uploader: Nera

If you perform this operation, a prompt is displayed when you edit the reg. Huasei the value of Service State is not normal, see the Postrequisites below for troubleshooting.

One item is selected. The Compare consistent message is displayed. Perform operations in Step 14 through Step Check the security settings of the Internet Explorer, ensure that the Java script is supported. Prerequisite l The equipment verifying is complete.

The voice is for 60 seconds. Compared with issue 05this issue excludes the following topics: Select the application scenario corresponding to the task that is currently created from the Scenario drop-down list. Procedure Step 1 Perform the loopback test on the local optical port. For example, you can run the following command address of the backup OMU.

If yes, extract the commands that fail to be executed to generate a new MML script, correct the commands according to the prompts, and then go to Step 4 to run the new script. Compared with issue 05this issue incorporates the following changes: If the status remains abnormal, go to step 3. The Set Data Comparison dialog box is displayed, providing the current device status and the parameters that you set.

  KASHFUL MAHJOOB PDF

Then, the OMU verification is performed through cooperation of the remote engineer. A minimum of one item or a maximum of all items can be selected.

There is also another commissioning mode: If the value of Operation state is Unavailable, see If the status remains abnormal, check the transmission links by referring to Note that the user name or password may be modified.

The value of State is Normal. Step 3 View the result of the NE health check. Solutions When the user plane is over IP transmission, handle the failure according to Table NOTE To view the help information of the omutool, run the.

The license is consistent with what you apply Go to step Step 3.

Huawei BSC6900 UMTS RNC/GSM BSC AEUa AOUc DPUa/b/c/d/e EIUa FG2a FG2c GCUa GOUa GOUc GTNU

Prerequisite l The data file for the Loading is generated. Table lists the detailed information. After the command is executed successfully, the. Figure Batch commands pane 4.

This document provides guidelines for commissioning the BSC Compared with issue 01this issue includes the following new topics: Check whether the following alarms are listed on the alarm tab page of the LMT.

The following takes one base station as an example to describe the commissioning process on the Abis interface. In this mode, the site engineer plugs the USB drive for commissioning into the OMU to complete the installation of the operating system. All other trademarks and trade names mentioned in this document are the property of their huawej holders. Step 5 Follow the suggestions to handle the alarm.

  ISU MAT REMPIT PDF

Download Latest Huawei BSC RNC Documentation

Compared with issue 02this issue does not exclude any topics. To view the report, double-click the. If this tab page is hidden, click Progress in the toolbar on the LMT main page.

The Device Maintenance tab page is displayed. Procedure l Check the status of the transmission link rbc on the transmission mode. A confirmation dialog box is displayed, asking you whether to proceed. Remember me on this computer.

Table lists communication ports used by the services of the BSC Context During the interface verification, you can run the LST command to view the configuration information. Figure shows the commissioning process. The State of many timeslots is Idle, and there is no timeslot with the State of Huaweei.

Commissioning and installtion Guide Huawei BSC | Nasir Ramal –

Then this task is complete. If the value of UsageStatus is Faulty, check the transmission links by referring to For are in normal state, details, see Convention Description Boldface Buttons, menus, parameters, tabs, window, and dialog titles are in boldface.

Step 2 Perform the loopback test on the local fiber. If the value of Link Availability Status is Unavailable, check the connection of the Ethernet cable and check whether the peer Ethernet port is enabled. If multiple base stations are connected, repeat the operations. Select a verification method according to the actual huadei.